Production overview

Two production lines, live (simulated data)

Connecting…

Day shift 08:00–20:00 · 11 Nov 2026

6270
Units this shift
Target 9196 · 68%
78%
Plant OEE
A 85% · P 93% · Q 98.7%
7 / 9
Machines running
1 down · 1 in changeover
1
Open alerts
Latest at 4:17:27 pm

Line A · Injection moulding 3690 / 5411

OEE 78%Availability 85% · Performance 93% · Quality 98.6%

Line B · SMT & assembly 2580 / 3785

OEE 78%Availability 85% · Performance 93% · Quality 98.8%

Throughput, last 60 minutes

Line A · Injection mouldingLine B · SMT & assemblyunits per minute, all stations
051015:1815:3315:4816:0316:17

Alerts

  1. 4:17:27 pmRunning ASM-01 back to running after 1m 08s
  2. 4:17:21 pmRunning ROB-01 back to running after 1m 04s
  3. 4:16:56 pmChangeover TRM-01 changeover started: Router housing, top
  4. 4:16:54 pmDown IM-01 down: Mould temperature high
  5. 4:16:19 pmDown ASM-01 down: Emergency stop pressed
  6. 4:16:17 pmDown ROB-01 down: Gripper fault
  7. 4:14:19 pmRunning SMT-01 back to running after 2m 58s
  8. 4:13:55 pmMaterial PKG-01 material low, refill needed
  9. 4:13:10 pmRunning ASM-01 back to running after 1m 04s
  10. 4:12:06 pmDown ASM-01 down: Emergency stop pressed
  11. 4:11:21 pmChangeover SMT-01 changeover started: Wi-Fi 6 router board
  12. 4:11:01 pmRunning AOI-01 back to running after 1m 11s
  13. 4:10:21 pmRunning SMT-01 back to running after 42s
  14. 4:10:16 pmRunning ROB-01 back to running after 1m 01s
  15. 4:10:09 pmRunning PKG-01 back to running after 36s
  16. 4:09:50 pmDown AOI-01 down: Material low
  17. 4:09:39 pmDown SMT-01 down: Feeder jam
  18. 4:09:33 pmDown PKG-01 down: Sensor fault
  19. 4:09:31 pmRunning IM-02 back to running after 50s
  20. 4:09:15 pmDown ROB-01 down: Sensor fault